To complete the first purchase of workwear in China safely and efficiently, we need to focus on four core links: supplier credibility verification, risk avoidance clause design, production process monitoring, and quality inspection. The following is a 12-step operation process that has been verified in practice.:
Ⅰ. Supplier screening stage (3-5 days)
1. Hard qualification review (indispensable)
-
✅ Business license (registered capital ≥ 1 million)
-
✅ Factory real scene photos/videos (production workshop + warehouse)
-
✅ Case studies of cooperative customers in the past three years (contract fragments or delivery orders are required)
Recommended Platform: -
Ali 1688 (look for the “Strong Merchant” logo and factory inspection video)
-
Made-in-China.com (screening ISO9001 certified companies)
2. Small batch trial production verification
-
Pay the sample fee (300-800 yuan) and request to make 3 pre-production samples (different sizes)
-
Test items:
-
Wash 3 times and check shrinkage (national standard ≤3%)
-
Tensile test at joints (≥120N)
-
Fabric composition testing (testing fee is about 200 yuan/item)
-
Ⅱ. Design of key contract clauses (key points for preventing pitfalls)
# List of core terms of tooling procurement contract 1. **Price terms**: indicate the price including tax (13% VAT special invoice) - Example: "$9/set (tax included, delivered at HAIYUAN Work Clothes factory)" 2. **Payment Methods**: - 30% deposit (within 3 days after the contract takes effect) - 60% to be paid after seeing the inspection report - 10% warranty deposit within 30 days after receiving the goods 3. **Quality breach clause**: - Color difference ≥ 4 levels (according to GB/T 3920 standard) - Defect rate ≤ 3%, double deduction for excess amount 4. **Delivery compensation**: - 0.5% of the total contract amount will be deducted for each day of delay (up to 10%) 5. **Intellectual Property Terms**: - "The ownership of the design draft belongs to the purchaser and shall not be reproduced without written authorization"
Note: Be sure to ask the other party to stamp and provide a copy of the signatory’s ID card
Ⅲ. Production process monitoring (must be done for the first order)
Timeline control table
node | Monitoring method | Cost/Time |
---|---|---|
Fabrics entering the factory | Request to take photos of missing labels | WeChat video confirmation |
Cutting Day 3 | Interim inspection by a third-party inspection company | ¥800/time |
48 hours before packaging | Conduct surprise inspections on your own (focusing on checking threads/stains) | Travel expenses¥1500 |
Recommended Services:
-
China Testing International (CTI): Professional factory inspection service (¥3000/time)
-
SGS: Quality system audit (suitable for large orders of more than 1,000 sets)
IV. Full Inspection Process Checklist (including self-inspection tools)
1. Basic tool kit (cost < 500 yuan)
- Portable electronic scale (check weight)
- Vernier caliper (measure seam width)
- Color fastness friction tester (Taobao¥260)
- Ultraviolet flashlight (check fluorescent brightener)
2. 7-step on-site inspection method
1. Random box selection (≥20% of the total number of boxes) 2. Compare with prenatal samples (collar/pockets and other key parts) 3. Measure 3 parts (bust ±1.5cm, length ±1cm) 4. Check the lining (check thread ends/lining stitching) 5. Check the washing label information (ingredients/washing symbols) 6. Functional test (resistance value of anti-static clothing ≤ 300MΩ) 7. Stain check (neckline/underarm key areas)
Ⅴ. Logistics risk control plan
Risk Type | Coping strategies | Cost savings |
---|---|---|
Cargo damage | Purchase cargo insurance (rate 0.3%) | ¥300/100,000 value |
Customs inspection | Advance classification HS code (6203.43) | Avoid misclassification penalties |
Factory Substitution | Container sealing and photo taking | Sealing fee ¥50/box |
Recommended logistics providers:
-
Deppon Logistics (large cargo unit price ¥1.8/kg)
-
CIMC Cold Cloud (constant temperature transportation, suitable for high-end uniforms)
Ⅵ. Template for efficient execution of first order
15-day full cycle schedule
Progress of the first order of work clothes section Supplier confirmation Qualification review : des1, 1d Proofing acceptance : des2, 3d section Production monitoring Bulk production : des3, 7d Mid-term inspection : des4, 1d section deliver Final Inspection and Payment: des5, 1d Delivery to warehouse : des6, 2d
Ⅶ. First Order Recommendation Cooperation Model
“1688 Guaranteed Transaction + Third-Party Inspection” Combination Plan
-
Place an order on 1688 and pay a deposit to the platform for hosting
-
Hire an inspection agency such as Inspection Helper to do in-production/final inspection (¥1500/time)
-
After the inspection is passed, the platform will release the money to the factory
Advantages: 0 capital risk, the final payment can be refused if there is a quality problem
Summary of blood and tears lessons (must read to avoid pitfalls)
-
⚠️ Refusal to pay the “full payment in advance” factory: A Zhejiang enterprise paid 80% in advance and then the factory lost contact
-
⚠️ Beware of “low price for all materials and labor”: Shandong factory was sued for 230,000 yuan for using recycled cotton to fill the bill
-
⚠️ The contract must specify the terms for handling defective products: “The factory will restock the defective products within 7 days and bear the return shipping costs”
According to this process, the first order delivery cycle can be shortened to 20 days, and the quality pass rate can be increased to more than 95%. It is recommended to control the first order quantity to 200-500 sets (to test the supplier’s capabilities), and then expand the order after confirming stability. Keep all communication records and quality inspection reports to establish a data benchmark for subsequent long-term cooperation.
Further reading:
China Import Work Clothes Process Guide
How to control costs when purchasing work clothes in China
How to find cheap manufacturers in China? A guide to avoid pitfalls