---
title: "Inside Our Workwear Factory: 12 Production Steps"
url: https://haiyuanworkclothes.com/factory-tour/
date: 2026-10-10
modified: 2026-10-10
author: "HAIYUAN Workwear Manufacturer"
description: "Our factory in Shijiazhuang, Hebei covers 20,000 m² with 600+ employees and 400+ machines, producing around 200,000 sets per month for customers in more than 30 countries. Every order moves..."
word_count: 2164
---

# Inside Our Workwear Factory: 12 Production Steps

![Interior of the Haiyuan workwear factory sewing floor with rows of industrial sewing machines and operators in hi-vis vests](https://haiyuanworkwear.com/wp-content/uploads/Haiyuan-worker-high-vis-workwear-sewing-workshop.webp)

**Our factory in Shijiazhuang, Hebei covers 20,000 m² with 600+ employees and 400+ machines, producing around 200,000 sets per month for customers in more than 30 countries. Every order moves through 12 production steps, from 4-point fabric inspection on arrival to carton verification before loading, and each step produces a written record that ships with the order.**

Most buyers never see the factory that makes their uniforms. This page shows the whole process: what happens at each of the 12 steps, what is checked, what can go wrong, and what documentation you receive as proof. It is the same process we use for a 200-piece trial order and a 200,000-piece programme.

Last updated: October 2026 · Factory in Shijiazhuang, Hebei, China · ISO 9001, ISO 14001, ISO 45001 and BSCI certified

**20,000**m² factory
**600+**employees
**400+**machines
**200,000**sets per month

On this page

- Who we are and what we make
- The 12 production steps
- What is checked at each stage
- Capacity and lead times
- Certifications and compliance
- How to verify all of this independently
- Materials, waste and working conditions
- Frequently asked questions

## 1. Who we are and what we make

Haiyuan has manufactured protective workwear since 2007, from a single sewing floor to a factory that today runs four production lines. We are a manufacturer, not a trading company: the cutting tables, sewing lines, inspection area and packing hall are all on the same site, and the certifications we hold are issued to us rather than to a partner factory.

![Haiyuan workwear factory building in Shijiazhuang, Hebei province, 20,000 square metres](https://haiyuanworkclothes.com/wp-content/uploads/factory-exterior.webp)
Our production site in Shijiazhuang, Hebei. Cutting, sewing, inspection and packing all happen in the same building.

| Product category | Typical construction | Standards available |
| ---------------- | -------------------- | ------------------- |
| Hi-vis clothing | Vests, polo shirts, jackets, trousers, coveralls | EN ISO 20471, ANSI/ISEA 107, CSA Z96 |
| Flame-resistant clothing | Coveralls, shirts, trousers, jackets in treated and inherent FR fabric | EN ISO 11612, NFPA 2112, ASTM F1506 |
| Anti-static and ESD garments | Jackets, trousers, coveralls with conductive grid fabric | EN 1149-5 |
| Chemical and acid-alkali resistant | Coated and laminated garments | EN 13034, EN 14605 where applicable |
| General workwear | Jackets, trousers, coveralls, bib overalls, T-shirts and polos | Buyer specification |
| Winter and waterproof | Insulated jackets, softshells, waterproof shells | EN 343 |

## 2. The 12 production steps

These twelve steps run in order for every order. The order does not move to the next step until the previous one is signed off, which is why a problem is normally caught before it reaches the customer.

- **Order review and technical file**Our merchandising team reviews your specification, measurements, BOM, branding and packing requirements against the factory's capability, and raises any point that cannot be produced as written. This is where most specification problems are caught, before anything is cut.

- **Fabric inspection on arrival**Every roll is inspected using the 4-point system, where defects are scored 1 to 4 by size and severity. Rolls that exceed the accepted threshold per 100 square yards are quarantined and returned to the mill rather than being cut into garments. Shade, width and GSM are checked at the same time.

![Fabric rolls being inspected on arrival at the factory using the 4-point defect scoring system](https://haiyuanworkclothes.com/images/step-02-fabric-inspection.webp)
Step 2: every roll is scored with the 4-point system. Rejected rolls go back to the mill, not into garments.

- **Fabric testing and pre-treatment**Shrinkage, colour fastness and, where applicable, FR or anti-static performance are verified before cutting. Fabric that will be washed or treated is processed in the required batch so that behaviour is consistent across the order.

- **Pattern making and grading**Patterns are produced for the base size and graded across the size range. Established blocks are reused where the construction matches, which is why a repeat order does not start from zero.

- **Sampling and approval**A pre-production sample is made and sent to you within 7–10 days for standard styles and 10–15 business days for fully custom designs. Nothing goes into bulk production until you approve the physical sample, not a photograph of it.

![Approved pre-production work jacket sample on a rack with its signed sample approval card](https://haiyuanworkclothes.com/images/step-05-sampling.webp)
Step 5: the approved sample is signed, dated and kept as the reference for every later quality decision.

- **Marker making and cutting**Cutting markers are laid to minimise fabric waste while respecting grain line, shade matching and panel direction. Panels are bundled by size and number so pieces from the same shade lot stay together.

![Cutting table with layered fabric and a straight knife cutter during marker cutting](https://haiyuanworkclothes.com/images/step-06-cutting.webp)
Step 6: markers are laid for fabric efficiency, with panels bundled by size and shade lot.

- **Cutting inspection**Bundles are counted and checked against the cutting record before they reach the line, so a missing or mis-cut panel is found before it becomes a finished garment with a problem.

- **Sewing and in-line inspection**Garments are assembled on the line, and an in-line check at 20–30% of production looks for stitch quality, measurement drift and component function. This is the highest-value check in the whole process, because a systematic error found here costs minutes to fix instead of a whole order.

![Operators sewing hi-vis work jackets on a production line at the Haiyuan factory](https://haiyuanworkclothes.com/images/step-08-sewing-line.webp)
Step 8: the in-line inspection runs at 20–30% of production, catching systematic errors while the line can still be corrected.

- **Decoration and branding**Logos are applied by embroidery, screen print or heat transfer according to your specification and placement diagram. On certified hi-vis garments, placement is checked against the tape layout so that branding never interferes with the compliant area.

![Embroidery machine stitching a company logo onto a work polo shirt](https://haiyuanworkclothes.com/images/step-09-embroidery.webp)
Step 9: embroidery, screen print and heat transfer are done in-house, with hi-vis placements checked against the tape layout.

- **End-of-line 100% check and finishing**Every garment is examined for workmanship, loose threads, component function and labelling, then pressed and folded to the packing standard you specified.

- **Final random inspection at AQL 2.5**Once the order is packed, a final inspection is carried out using ISO 2859-1 sampling at AQL 2.5 for major defects and 4.0 for minor, with zero tolerance for critical defects such as needle fragments or missing compliance markings. You receive the report with photographs, and independent third-party inspection is welcome at this stage.

![Quality inspector measuring a finished garment during the final AQL 2.5 inspection](https://haiyuanworkclothes.com/images/step-11-final-inspection.webp)
Step 11: final inspection follows ISO 2859-1 sampling at AQL 2.5, with photographs of every defect category.

- **Carton verification and loading**Cartons are checked against the packing list for quantity, size assortment, carton marks and gross weight before loading. The verified packing list is issued with the shipping documents.

![Finished workwear being packed into export cartons with a verified packing list](https://haiyuanworkclothes.com/images/step-12-packing.webp)
Step 12: cartons are verified against the packing list for quantity, assortment and carton marks before loading.

## 3. What is checked at each stage

| Production step | What is checked | Record issued |
| --------------- | --------------- | ------------- |
| Order review | Specification, measurements, BOM, capability | Technical file and clarification notes |
| Fabric arrival | 4-point defect scoring, GSM, shade, width | Fabric inspection sheet and roll rejections |
| Fabric testing | Shrinkage, colour fastness, FR and anti-static performance | Test data referenced to the order |
| Pattern and grading | Measurement set against the approved chart | Graded measurement chart |
| Sampling | Fit, measurements, branding, packing | Approved sample card, signed and dated |
| Cutting | Marker accuracy, panel count, shade matching | Cutting record by bundle |
| In-line | Stitch quality, measurement drift, components | In-line report with photographs |
| Decoration | Position, size, colour, tape clearance on hi-vis | Decoration approval against placement diagram |
| End of line | 100% workmanship and labelling check | End-line tally |
| Final inspection | AQL 2.5 major, 4.0 minor, zero critical | Final inspection report with photographs |
| Packing and loading | Quantity, assortment, carton marks, weight | Verified packing list |

Two of these checks matter more than the rest. The 4-point fabric inspection prevents a mill problem from becoming a garment problem, and the in-line check catches systematic errors while the line can still be corrected. If you only ever witness two parts of the process, witness those two.

## 4. Capacity and lead times

| Item | Typical figure | Notes |
| ---- | -------------- | ----- |
| Monthly capacity | 200,000 sets | Across four lines: hi-vis, FR and general workwear |
| Minimum order | 100 pieces per style and colour | 50 pieces on selected stock items |
| Sampling | 7–10 days standard, 10–15 business days custom | Two rounds are common for new constructions |
| Bulk production | 20–40 days after sample approval | 45–60 days in the August to November peak |
| Certification testing | 2–4 weeks per style | Required once per fabric and tape construction |
| Quotation response | Within 24 hours | With a complete specification |

The honest limitation is peak season. Between August and November the factory is at capacity, samples take longer and production extends by one to three weeks. That is why our guidance for winter programmes is to place orders between April and June, and for anything shipping before Chinese New Year to order by early November.

## 5. Certifications and compliance

![Haiyuan factory certification wall showing ISO 9001, ISO 14001, ISO 45001, BSCI and product certification documents](https://haiyuanworkclothes.com/images/certification-wall.webp)
Factory and product certifications. Certificate numbers are provided with quotations so your compliance team can verify them.

| Certification | What it covers | Why it matters to you |
| ------------- | -------------- | --------------------- |
| ISO 9001 | Quality management system | Evidence of a documented, audited process |
| ISO 14001 | Environmental management | Increasingly requested in tenders and ESG reporting |
| ISO 45001 | Occupational health and safety | Worker safety on the production floor |
| BSCI audit | Social compliance | Requested by European retailers and larger distributors |
| EN ISO 20471 / ANSI/ISEA 107 | Hi-vis product performance | Required to sell hi-vis in the EU, UK and US |
| EN ISO 11612 / NFPA 2112 / ASTM F1506 | Heat, flame and arc protection | Required for FR and arc-rated programmes |
| EN 1149-5 | Anti-static performance | Required in classified or electronics environments |

Certificates are only useful if they name your product. When we quote a certified garment, the test report and declaration of conformity identify the specific style, fabric and tape rather than a generic category, and we provide the certificate numbers so your compliance team can verify them.

## 6. How to verify all of this independently

You should not take a factory page at its word. Every claim on this page can be checked, and we encourage buyers to check them before paying a deposit.

| Claim | How to verify it |
| ----- | ---------------- |
| Factory size, staff and machines | Live video call walking the production floor, or a physical visit |
| Capacity and lead times | Ask for the current production schedule and test the arithmetic: workers × machines × output per day |
| Certifications | Certificate numbers checked against the issuing body's database, and audit reports with their reference numbers |
| Legal entity | Business licence with the unified social credit code, and a bank account in the same registered name |
| Quality process | Inspection reports from previous orders, and third-party inspection access on your own order |
| References | Two contactable customers buying comparable products |
| Product performance | The test report for your specific style, plus your own sample worn and washed before bulk |

**What we send before you commit to a deposit:**

- Business licence and factory address
- A scheduled live video tour of the production floor
- Certificate numbers for verification
- A priced quotation with fabric, labour and packaging lines shown separately
- A physical sample for your approval, and a paid sample order if you want one

## 7. Materials, waste and working conditions

Sustainability claims are easy to make and hard to verify, so here is what we can actually document.

| Area | Current practice | Documentation available |
| ---- | ---------------- | ----------------------- |
| Fabric waste | Marker optimisation to reduce offcuts; offcuts sorted for recycling rather than landfill where the fibre permits | Available on request |
| Restricted substances | OEKO-TEX certified fabrics available; PFAS-free finishes available on request | Certificate and finish declaration |
| Worker conditions | ISO 45001 management system and BSCI social audit | Audit report reference |
| Packaging | Recycled-content polybags and paper-based alternatives available | Specification on request |
| Energy | LED lighting and inverter-driven motors across the production floor, with consumption reviewed monthly | Figures available on request |

If your tender requires environmental data, ask us for the specific document rather than accepting a general statement. The same applies to any supplier: the audit report reference, the fabric certificate and the finish declaration are the three documents that carry weight.

## 8. Frequently asked questions

### Can I visit your factory?

Yes, and we encourage it for orders above roughly US$50,000 or for any certified programme. If travel is not practical, we will schedule a live video call walking the production floor, including the cutting tables, sewing lines, inspection area and packing hall.

### Can I use a third-party inspector on my order?

Yes. Inspection access is written into our quotations, and we provide the carton list and packing plan in advance so an independent inspector can work to your checklist at AQL 2.5 or any other level you specify.

### What is your production capacity?

Around 200,000 sets per month across four production lines, with approximately 600 employees and more than 400 machines. Capacity for certified hi-vis and FR garments depends on fabric and tape availability at the time of order.

### How long does production take?

Sampling takes 7–10 days for standard styles and 10–15 business days for fully custom designs. Bulk production runs 20–40 days after sample approval, extending to 45–60 days during the August to November peak season.

### Are you a factory or a trading company?

We are a manufacturer. Cutting, sewing, inspection and packing all happen in our own building, our business licence names us as a garment manufacturer, and our product certifications are issued to us rather than to a partner factory.

### What is your quality standard?

AQL 2.5 for major defects and 4.0 for minor defects using ISO 2859-1 sampling, with zero tolerance for critical defects. Fabric is inspected on arrival with the 4-point system, and an in-line check runs at 20–30% of production.

### Which certifications do you hold?

ISO 9001, ISO 14001, ISO 45001 and a BSCI social audit for the factory, plus product certification to EN ISO 20471, ANSI/ISEA 107, EN ISO 11612, NFPA 2112, ASTM F1506 and EN 1149-5 for the relevant garment types.

### Do you work with new buyers or only large accounts?

Both. Our minimum order is 100 pieces per style and colour, with 50 pieces available on selected stock items, so a first trial order is viable. Many long-term customers started with a single trial order before scaling.

Want to see the factory or price a programme? [Book a video tour or request a quotation](/contact/) · [Workwear sourcing guide](/knowledge-centre/) · [Wholesale work clothes](/wholesale-work-clothes/)