Last updated 14 October 2026

Ready Stock and Urgent Workwear Orders: Getting Delivery in Weeks, Not Months

"Ready stock" means different things at different suppliers, and the difference decides whether your order arrives in two weeks or ten. At our factory it means stock fabric and stock patterns — garments we can cut, make and brand in 7–12 days rather than the 25–30 days a bespoke specification takes. It does not mean 10,000 pieces of your colour sitting in a warehouse. Nothing in this industry does, and any supplier who says otherwise is describing something else.

Request a bulk quotation WhatsApp us
7–10 daysSample lead time
7–12 daysFastest bulk
25–30 daysStandard bulk
Add 26–38 days by seaFastest to Africa
within 4 hrsQuote reply

Key takeaways

  • Speed comes from removing variables, not from asking for a favour. Stock fabric instead of a bespoke dye lot, an existing pattern instead of a new one, one embroidery position instead of a four-colour print: each step you remove takes days off the schedule.
  • The single biggest lever is fabric. A custom colour means a dye lot, and a dye lot has a minimum and a lead time of its own. Working from a colour we already carry can take two to three weeks off a bulk order.
  • Air freight on garments costs roughly USD 3–6 per piece more than sea freight on a coverall order. That is worth paying to protect a mobilisation date and rarely worth paying because the goods are inconvenient to wait for.
  • A partial shipment is almost always better than a late complete one, if the receiving site can accept it. Ask us to ship what is ready and finish the balance, rather than holding everything for one sailing.
  • We will tell you honestly when your date is not achievable. A late container costs you more than an awkward conversation three weeks earlier.

1. What "ready stock" actually means in this trade

When a buyer asks for stock, they usually mean one of three quite different things. It is worth knowing which one you are asking for.

TierWhat it meansRealistic lead time
Finished goods in stockGarments already made and boxed. In practice this means a narrow range of core styles in core colours, in the sizes that happened to be produced for the previous order. Useful for a small top-up, not for a projectDays, subject to availability
Stock fabric and stock patternThe fabric is already woven and dyed in a colour we hold, and the pattern already exists. We cut, sew, brand, inspect and pack. This is what we mean by ready stock, and it is where most genuinely fast orders come from7–12 days for bulk
Made to orderA new colour, a new fabric weight, a changed pattern or a new logo method. Everything is possible, and everything has a lead time attached to it25–30 days standard, 30–40 for complex

So when we say an order can be ready in a week, we mean the second tier: we already have the cloth and the pattern, and the order is entirely within our control. When we say three to four weeks, it is because the fabric has to be produced or dyed first — and no amount of pressure changes the fact that a dye house needs the cloth in its machine for a period of time.

2. The realistic timeline ladder

If you need it inThis is achievable whenWhat it rules out
48 hoursEssentially only for samples we already hold, or a small top-up from finished stockEverything else. Do not plan a project around this
7–10 daysSmall quantities from stock fabric and stock patterns, one embroidery position, standard carton, air or express freight to destinationCustom colours, custom fabrics, screen printing, complex decoration, large quantities
12–18 daysLarger volumes from stock fabric, and orders where the fabric exists but the pattern needs grading or the logo method is printNew fabric development, unusual performance finishes
25–30 daysStandard production: a specified fabric, your colour, your size ratio, your branding. This is the normal commercial lead time and the basis of most quotationsNothing, within reason — this is the default
30–40 daysComplex orders: multiple styles in one shipment, a bespoke performance fabric, or a large volume that has to be scheduled across production lines—

Those are production times from deposit. Add shipping: 9–18 days to Southeast Asian ports, 26–38 days to African ports, and then clearance and the inland leg. An honest total from deposit to goods on site is three to four weeks for a fast Southeast Asian order and nine to fourteen weeks for Africa.

3. Is your order actually urgent?

We ask this more often than buyers expect, and it is not a deflection. There is a real difference between three situations that all arrive described as urgent:

  • A hard date. A mine shutdown window, a contract mobilisation, a harvest, a project milestone. The date is immovable and there is a real cost per day of delay. This justifies paying for speed.
  • A soft date. A target that could move by two weeks without consequences. This usually does not justify air freight or a shortcut on specification.
  • Someone else's deadline. A procurement officer asked for a delivery date before checking with the site. Worth confirming before you pay a premium to meet it.

Tell us which one it is and we will answer differently in each case. For a hard date, we will quote the fastest honest route including air freight and tell you what it costs. For a soft date, we will quote the standard schedule and you will save the premium.

4. Ten things that make an order faster

  1. Choose a colour we already carry. This is worth more than every other item on this list combined. A custom colour means a dye lot; a stock colour means we start cutting immediately.
  2. Use an existing pattern. Our catalogue styles are already graded. A new pattern or a significant pattern change adds design, sampling and approval time.
  3. One logo position, embroidery. Embroidery setup is per needle position rather than per colour, so a multicolour logo is faster and cheaper to set up as embroidery than as screen print. Four-colour printing needs four screens before the first garment is printed.
  4. Give us the size ratio in the first message. Not "we'll confirm later". Chasing a size ratio after the deposit is one of the most common causes of a week lost.
  5. Approve the sample fast, or skip it. The sample takes 7–10 days. If you have bought this specification before, say so and we will proceed without one, subject to the fabric being from the same lot.
  6. Pay the deposit the same week. An order does not enter the production schedule until the deposit lands, and the schedule is a queue.
  7. Take standard export cartons. Individually poly-bagged, retail-hung or custom-printed cartons all add packing time.
  8. Do not add a second style late. Two styles in one shipment at the pre-agreed price is a different order from two styles added a week apart.
  9. Start the import documentation on day one. In Nigeria, Kenya, Tanzania and Uganda, a pre-shipment conformity certificate can take longer than the production. Speed in the factory is wasted if the certificate starts in week three.
  10. Decide who imports before you order. The named importer determines what documents we prepare and, in some markets, who the certificate is issued to.

5. Air freight: when it is worth it

Garments are light for their volume, which makes air freight expensive per piece relative to the value of the goods. That does not mean it is never right — it means the decision should be arithmetic rather than reflexive.

Sea freightAir freight
Transit to an African port26–38 days5–8 days door to door
Transit to a Southeast Asian port9–18 days3–5 days door to door
Indicative cost for a coverall orderLow per piece — the goods are bulky but the box is filled efficientlyRoughly USD 3–6 more per piece, because a coverall weighs about a kilogram and air freight is priced by weight
When it makes senseAlmost alwaysA hard date, a small quantity, or a first delivery followed by the balance by sea

The arithmetic that decides it. On a 500-piece coverall order, air freight adds roughly USD 1,500–3,000 in total. If that protects a mobilisation date worth more to you than that — and a single day of a stalled site usually is — it is the right call. If the goods are simply arriving later than you would like, it is not. We will quote both side by side so the comparison is in front of you rather than in a conversation.

A middle route that buyers forget: air-freight part, sea-freight the rest. Send the quantity needed to open the site by air and the balance by sea. It is often the cheapest way to solve an urgent problem, because you pay the air premium on a fraction of the order.

6. Splitting a shipment

A partial shipment is usually better than a late complete one. If the receiving site can work with two deliveries, we can ship what is ready on the next available sailing and finish the balance for the following one. Two conditions: the receiving end has to be able to accept and store a partial consignment, and the packing list has to be accurate, because a partial shipment that is not itemised properly creates a customs problem rather than solving a delivery problem.

One container has one bill of lading and one destination port, so a split is two consignments and two clearance events. For a market with a pre-shipment certificate, that may mean two certificates. Where that is the case we will say so before you commit, because it can change which option is cheaper.

7. What we hold in stock

CategoryWhat is normally available from stockFast-order lead time
Coveralls and overallsCore poly-cotton constructions in a defined colour range, sizes S to 5XL7–12 days
Hi-vis vests and polosStandard colours to common visibility configurations7–12 days
Work trousers and shirtsCore colours in standard sizes10–15 days
Anti-static and FR rangesAvailable, but the fabric is specified rather than stocked in every colour, because performance fabric has to be tested in the lot it is used in18–25 days
Bespoke colour or bespoke fabricNot stocked. Made to order25–40 days

Ask us for the current stock colour card. It changes as lots are consumed, and the fastest quote we can give you is one where you pick a colour that already exists. If you tell us the date you need the goods and the colour you want, we will tell you which of the two has to give.

8. What nobody can honestly promise

  • 10,000 pieces in a bespoke colour in ten days. The dye lot alone makes it impossible.
  • A certificate you have not started. In markets with pre-shipment conformity, the process depends on inspection and testing. It cannot be compressed by asking.
  • A container that sails before the certificate is issued. Some suppliers will load and hope. We will not, unless you instruct us in writing that you are carrying the clearance risk — because the consequence lands on you, not on us.
  • The same price for the fast version. A fabric that is already dyed costs what it costs; a new dye lot has a minimum that has to be spread across the order.

What we will do is tell you the fastest honest route, what it adds to the price, and which parts of your date are within our control and which are not. See low MOQ orders and how they are priced for how small and fast orders are costed, and shipping and delivery for freight options.

9. Frequently asked questions

Frequently asked questions

Do you have ready stock of workwear?

We hold stock fabric and stock patterns rather than large finished-goods inventory. That means we can cut, make and brand an order in 7–12 days when the colour and style are ones we already carry. Ask for the current stock colour card — the fastest quote is always one where you pick a colour that already exists.

What is the fastest possible delivery?

For a small quantity from stock fabric with one embroidery position, 7–12 days production. Add 3–5 days to a Southeast Asian destination or 5–8 days to an African destination by air. Under 48 hours is only realistic for samples we already hold or a small top-up from existing finished stock.

Why does a custom colour add so much time?

Because the fabric has to be dyed to your colour, and a dye lot has both a minimum quantity and a production slot of its own. Working from a colour we already carry removes that entire step. This is usually the difference between a two-week order and a five-week order.

How much more does air freight cost?

On a coverall order, air freight adds roughly USD 3–6 per piece over sea freight, because garments are light but bulky and air freight is priced by weight. It is worth paying for a hard project date. A useful middle route is to send the quantity needed to open the site by air and the balance by sea.

Can you ship part of the order now and the rest later?

Yes, if the receiving site can accept two deliveries. A partial shipment that is itemised accurately is usually better than a late complete one. Note that two shipments mean two bills of lading and, in markets with pre-shipment conformity, potentially two certificates — we will tell you when that applies before you commit.

Can you guarantee a delivery date?

We will commit to a production date and a sailing, and we will tell you what is outside our control: carrier schedules, port congestion, clearance and the inland leg. What we will not do is quote a date we do not believe in order to win the order. A container that misses a mobilisation costs you far more than an awkward conversation three weeks earlier.

Can you produce FR or anti-static garments quickly?

Faster than a bespoke programme, but not as fast as standard poly-cotton. Performance fabrics have to be tested in the lot they are used in, so we do not keep every colour in stock. Budget 18–25 days, and tell us the standard and class early — that, not the product name, decides which fabric qualifies.

What is the minimum order for a fast order?

The same as any other order: 300 pieces per style and colour for a trial. For a genuine emergency we can sometimes work with less from stock fabric, but the per-piece premium is higher. Tell us the actual quantity and the actual date and we will tell you what is possible.

Fastest route checklist

Tell us the date you need it

Send the garment, the quantity, the destination and the date the goods must be on site. We will come back with the fastest honest route, what it adds to the price, and which parts of the date we can commit to — within four working hours.

Request a bulk quotation
Scroll to Top

Submit Your Request

Please submit your requirements