Bulk Workwear Orders — MOQ, Lead Times, Pricing and the Order Process

Everything a buyer needs before placing a bulk workwear order with a Chinese factory: the realistic minimum order, how long production and freight actually take, what drives the price per piece, and the eight steps from enquiry to delivery. Written for purchasing teams, not for show.

Get a quote in 2 hours Jump to MOQ table

Minimum order quantity (MOQ)

Most Chinese workwear factories quote a minimum somewhere between 100 and 1,000 pieces and then negotiate. These are our published numbers — no negotiation required to find them out.

Order typeMinimumNotes
Stock items50 pcsMixed sizes within one style and colour
Standard custom production100 pcs per style and colourOur normal working minimum
Custom fabric or custom dyeing300–1,000 pcs, or 500 m of fabricDriven by the mill's minimum, not ours
Logo embroidery50 pcs+2–3 days on top of garment production
Screen printing100 pcs+3–5 days
Heat transfer50 pcs+2–4 days
Private label branding100 pcs garmentsLabels themselves: 1,000–3,000 pieces

How to hit MOQ without over-ordering

  • Consolidate colours — one colour across two roles usually clears the minimum on its own.
  • Start on stock colouring and fabric, then customise on the second order once the style is proven.
  • Order branding items in bulk once — labels and hang tags do not expire, and they are reused across every production run.
  • Split a container with another buyer in your market. Our distributor programme exists partly to make this straightforward.
  • Plan a two-size-set launch — core sizes first, extremes in the replenishment order.

Lead times, in the order they happen

StageTypical timeWhat we need from you
QuotationWithin 2 working hours [confirm: business hours and time zone]Quantity, style reference or tech pack, destination
Sample — standard7–10 daysSize, colour, logo files
Sample — custom development10–15 business daysFabric standard, testing requirements
Sample approval2 revision rounds includedWritten comments
Bulk production1–3 weeks after approvalApproved sample, purchase order, artwork, deposit
Booking and loading3–7 daysShipping instructions, carton marks
Courier, door to door (<200 kg)5–7 days—
Air freight (200–1,000 kg)7–10 days—
Sea freight (>1,000 kg)30–50 days—
Freight is not the only clock. Sea freight is cheap per kilogram but adds five to seven weeks; air freight is fast but costs several times more. On winter ranges, ordering four months before the season starts almost always beats paying for air freight later. More detail on shipping and delivery options.

What makes up the price per piece

Understanding the six components makes any two quotations comparable, and it is the fastest way to judge whether a price is realistic.

ComponentShare of costWhat moves it
Fabric35–55%Fibre (cotton vs poly-cotton vs FR-treated), weight in g/m², mill minimum
Labour15–25%Stitch count, pocketing, complexity, order quantity
Trims and accessories8–15%Reflective tape grade, zippers, snaps, Velcro, thread
Branding2–6%Embroidery or print, number of positions, number of colours [confirm: indicative cost per position]
Packaging1–4%Polybag, hang tag, retail box, carton print
Freight and dutiesVariesIncoterm, volume, destination, duty rate

Landed cost is not the unit price

Add the Incoterm, freight, insurance, import duty, inland delivery and the cost of your own inspection. On a 100,000-piece programme, a 5% saving on fabric is worth more than a 20% negotiation on labour — which is why we ask for the fabric weight before we ask for the target price.

Why a 20% cheaper quote usually costs more

  • Fabric weight reduced from 300 to 240 g/m² — the same garment, 20% less cotton.
  • Uncertified reflective tape, which fails retroreflection after 25 washes.
  • Reactive instead of pre-shrunk fabric, so garments lose a size after the first industrial wash.
  • Freight excluded from the quote and added at booking.

Ask every supplier for a like-for-like sheet: fabric weight, tape certification, stitch count, branding positions and Incoterm. We send ours as standard with each quotation.

Payment, Incoterms and documents

ItemStandard
Deposit and balance[confirm: e.g. 30% deposit, 70% against copy of B/L]
Payment methodsT/T, L/C at sight, Trade Assurance for first orders [confirm]
IncotermsFOB, CIF, CFR, DDP
Documents suppliedCommercial invoice, packing list, B/L or AWB, certificate of origin (Form A / FTA where applicable), insurance certificate, test reports
InspectionOur own in-line plus AQL 2.5 final inspection; third-party inspection by your agent welcome [confirm: inspection cost allocation]

The order process, step by step

  1. Enquiry. Send quantity, standard, destination and deadline. A photo or drawing is enough to start.
  2. Quotation. Written quote within 2 working hours with MOQ, unit price, lead time and freight options.
  3. Feasibility and counter sample. We comment on your tech pack or reference garment and confirm what is achievable at your price point.
  4. Pre-production sample. 7–10 days. Fit, print colour, size and labelling are fixed at this stage.
  5. Sample approval. Two rounds of revisions included; nothing goes into bulk without written approval.
  6. Bulk production. 1–3 weeks on dedicated lines, with in-line inspection throughout.
  7. Quality control. Final AQL 2.5 inspection, packing check and a photo report before the balance payment.
  8. Packing, shipping and documents. Polybag, carton marks, export paperwork and tracking to your door.

Customisation options and minimums are listed on custom workwear manufacturing; labelling, hang tags and packaging on labels, tags and packaging.

Capacity calendar: when to order

Our four lines run about 200,000 sets a month, and capacity is booked — not stored. Two periods fill up every year:

SeasonPressure pointOrder by
Winter workwear (Q4 delivery)August–October peakJune–July
Spring/summer ranges (Q1–Q2 delivery)Chinese New Year shutdownNovember, before the holiday
Annual uniform programmesBudget-year startConfirm the specification one quarter ahead

If your site needs garments for a fixed date, tell us the date in the first email. We will tell you the last booking date that still works, rather than promising a date we cannot hold.

Buyer questions

Can I order a trial quantity first?

Yes. 50 pieces on stock items, or 100 pieces custom, is a normal first order, and the same specification is then reused for the production run.

Do you charge for samples?

The first sample piece is free on standard styles; custom development is charged and usually credited against the bulk order. [confirm: sample charge and credit policy]

Can I mix sizes in one order?

Yes, within one style and colour, using a size ratio you specify. Size ratio planning matters because an unbalanced order leaves unsellable extremes in stock; if you are unsure, send your size survey and we will propose a ratio.

What happens if the goods fail inspection?

We rework or remake before shipping, and the photo and measurement report is sent before the balance payment. Nothing is loaded until the inspection points are closed.

How do I compare your price with another factory?

Ask both for fabric weight, reflective tape certification, stitch count, branding positions, packaging and Incoterm. A like-for-like comparison sheet is available on request.

Can you deliver DDP to my warehouse?

Yes, for most destinations. Ask for a DDP quote alongside FOB so you can see the delivered cost rather than the factory gate price.

Do you supply the whole uniform programme or just the garments?

Both. Garment manufacturing is the core, but we also handle size surveys, wearer trials, packing and labelling by site, and staged deliveries. See corporate uniform programmes.

Price your order correctly the first time

Send quantity, fabric or standard, size ratio, branding and destination. You will have a written quotation, with MOQ and lead time, within two working hours.

Request a quote

Scroll to Top

Submit Your Request

Please submit your requirements